104-106 Albert Street, Preston
近期公告
  • 02nd 三月 2026, 104 Albert street Preston

    Gday everyone,

    2 week look ahead.

    02/03-06/03

    We are looking at fitting off everything inside, vantage, national plumbing and inex are our front runners this week.
    -Thursday, 05/03, we will be removing spoil from site, so please no deliveries.
    -kitchen install on the Friday, 06/03.

    The following week, 10/03-13/03.

    Still looking at finishing fitting off with econium joining us.
    -there will be another day of spoil removal on Thursday, 12/03.

    Monday, 09/03, is a public holiday.

    Regards,
    Damien

  • 16th 二月 2026, 104 Albert street preston

    Gday everyone,

    Just a reminder we are starting our major under works at the front of site this Wednesday, 18/02. This means NO PARKING ON SITE for the rest of the week and possibly next week.
    I’d also like to add that the flooring will be finished this week. So please BRING A SPARE PAIR OF SHOES. Any damage to flooring will result in back charges.

    Any queries please don’t hesitate to reach out.

    Regards,
    Damien

  • 05th 一月 2026, Welcome back to wheelers hill

    Weekly bulletin.
    Welcome back to Wheelers hill

    Monday 05/01/2026
    ICC Return to site and begin basement SOG prep
     
    Tuesday 06/01/2026
    ICC continue basement SOG prep
     
    Wednesday 07/01/2026
    ICC Poly and Mesh Basement SOG
     
    Thursday 08/01/2026
    ICC Continues Poly and Mesh, Set Evaporation Drains, Set Basement Pit Lid Heights
    Preslab Inspection in afternoon
     
    Friday 09/01/2026
    ICC Pour Basement Slab
     
    Saturday 10/01/2026
    ICC Sawcut Slab
    ICC Install Starter Bars for Columns
     
    Monday 12/01/2026
    Adbri Block Delivery
    ICC Cages and Formwork for Columns
    Masonry Masters Install Blocks
     
    Tuesday 13/01/2026
    ICC Cages and Formwork for Columns
    ICC Ramp Slab Prep
    Masonry Masters Install Blocks
     
    Wednesday 14/01/2026
    ICC Close Up Formwork for Columns
    Column Inspection
    ICC Pour Columns
    ICC Ramp Slab Prep
    Masonry Masters Install Blocks
     
    Thursday 15/01/2026
    Donmar Corefill Blocks
    ICC Ramp Prep
    Ramp Inspection
     
    Friday 16/01/2026
    ICC Pour Ramp

现场天气预报
当前现场天气

最近更新: 13:21
温度: 27C (应用程序 27C)
风速: 13KMH
最大 风: 15KMH @0:21
自上午9点开始降雨: 0.0mm
最低温度: 14C @7:46
最高温度: 31C @15:53 2026/3/22
阵风: 15KMH
最大风力: 15KMH @13:21


观测信息来自 - Bureau of Meteorology
观测位置 - Essendon Airport、VICTORIA
时区 - 澳大利亚东部标准时间
预测 - 星期一、23 三月

Shower or two. Possible storm.
最低: 16C 最大: 25C
可能有雨。: 50%
预计降雨: 0 至 3mm


预测信息来自 - Bureau of Meteorology
预测位置 - Melbourne、VICTORIA
时区 - 澳大利亚东部标准时间
明天 - 星期二, 24 三月

Showers increasing.
最低: 18C 最大: 27C
可能有雨。: 80%
预计降雨: 1 至 10mm


重要现场文件
刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册

刚到这个现场吗?

您知道这个现场的PPE要求吗?

确保您在现场的第一天有正确的安全设备。

查看现场PPE要求

刚到这个现场吗?

到达现场后尽快开始工作。

在您方便的时候在线完成现场注册,节省您的时间。

开始注册